Merge pull request #2463 from lima-vm/dependabot/go_modules/google.go… #5031
test.yml
on: push
Lints
4m 27s
Windows tests
7m 30s
Integration tests
15m 24s
VMNet test
18m 22s
Matrix: Colima
Matrix: Integration tests (on Linux)
Matrix: Unit tests
Matrix: Upgrade test
Matrix: vz
Annotations
8 warnings
Integration tests (on Linux) (fedora.yaml)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Integration tests
curl 8.8.0 is already installed and up-to-date.
To reinstall 8.8.0, run:
brew reinstall curl
|
Integration tests
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (fedora.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (experimental/vz.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
VMNet test
qemu 9.0.1 is already installed and up-to-date.
To reinstall 9.0.1, run:
brew reinstall qemu
|
Upgrade test (v0.15.1)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Upgrade test (v0.15.1)
qemu 9.0.1 is already installed and up-to-date.
To reinstall 9.0.1, run:
brew reinstall qemu
|