Add logic to reset the extra_reference_date
after a network unwrapping
#1212
test-build-push.yml
on: pull_request
Build Docker image and push to GitHub Container Registry
2m 2s
Matrix: pytest
Annotations
3 errors
ubuntu-latest • Latest
Process completed with exit code 2.
|
macos-14 • Latest
The job was canceled because "ubuntu-latest_Latest_isce" failed.
|
macos-14 • Latest
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
isce-framework~dolphin~ZQOS86.dockerbuild
|
62.1 KB |
|