chore: add binaries for 1.27.100,1.28.15, 1.29.10, 1.30.6, 1.31.2 #5144
Azure Pipelines / AKS Linux VHD Build - PR check-in gate
failed
Oct 25, 2024 in 1h 0m 58s
Build #20241024.21_Ubuntu18.04_V1_no_merge failed
Details
- Failed: 0 (0.00%)
- Passed: 25 (100.00%)
- Other: 0 (0.00%)
- Total: 25
Annotations
Check failure on line 417 in Build log
azure-pipelines / AKS Linux VHD Build - PR check-in gate
Build log #L417
Bash exited with code '2'.
Loading